The Pre-Build Checklist: Everything to Sort Before Work Starts

Starting a building project without sorting the paperwork first is one of the most expensive mistakes you can make. This checklist covers everything you need to have in place before your builder starts on site.

Print it, tick it off, and avoid the surprises that catch most homeowners out.

Last updated: April 2026

Planning and permissions

  • Confirmed whether you need planning permission — use our free PD checker
  • Applied for planning permission (if needed) — fee: £548, timeline: 8 weeks (how to apply)
  • Received planning approval with conditions noted and understood
  • Applied for a Lawful Development Certificate (if building under PD) — fee: £274
  • Checked for Article 4 directions at your address that may remove PD rights
  • Checked if your property is in a conservation area, National Park, AONB, or World Heritage Site
  • Applied for listed building consent (if applicable)

Building regulations

  • Chosen Building Notice or Full Plans route
  • Chosen building control providerlocal authority or private inspector
  • Submitted building regulations application — typical fee: £400–£900
  • Received Full Plans approval (if using Full Plans route)
  • Structural engineer appointed and calculations completed (guide)
  • Structural drawings issued to builder and building control

Party Wall Act

  • Determined if the Party Wall Act applies to your project
  • Served party wall notices on all affected neighbours — minimum 1–2 months before work starts
  • Received consent from neighbours OR appointed surveyors for dissenting neighbours
  • Party wall award received (if surveyors were appointed)
  • Schedule of condition completed for neighbouring properties

Professional appointments

  • Architect or designer appointed and drawings finalised (do you need one?)
  • Structural engineer appointed and calculations completed
  • Builder selected — at least 3 quotes obtained and references checked
  • Build contract agreed — scope of work, price, payment schedule, timeline, and what is excluded
  • Party wall surveyor appointed (if needed)

Insurance and finance

  • Notified your buildings insurance provider about the planned work
  • Confirmed your builder has public liability insurance (minimum £2 million)
  • Confirmed your builder has employers’ liability insurance
  • Agreed a payment schedule — never pay more than 10–15% upfront
  • Considered a professional warranty (e.g., CRL, LABC warranty) for the building work

Utilities and services

  • Checked for underground services — gas, electric, water, drainage, telecoms. Request utility maps before digging.
  • Contacted the water company if building over or near a public sewer
  • Arranged temporary utility connections if existing services will be disrupted
  • Planned temporary kitchen arrangements if your kitchen will be out of action

Neighbour relations and site preparation

Neighbour relations

  • Talked to your neighbours about the project before formal notices
  • Shared plans with immediately affected neighbours
  • Agreed working hours — check your council’s standard construction hours (usually 8am–6pm weekdays, 8am–1pm Saturdays, no Sundays)

Site preparation

  • Cleared the work area — moved plants, furniture, sheds, or anything in the way
  • Arranged skip hire or waste removal for the build
  • Checked if you need a skip licence — required if the skip is on a public road
  • Checked if you need a scaffolding licence — required if scaffolding goes on the pavement
  • Protected plants, trees, and garden features you want to keep
  • Arranged temporary fencing or hoarding if needed for site safety

Documentation to keep

Throughout the project, collect and file these documents — you will need them when you sell:

  • Planning permission decision notice (or LDC)
  • Building regulations approval (Full Plans) or Building Notice acknowledgement
  • Building control completion certificate
  • Structural engineer’s calculations and drawings
  • Party wall award and schedule of condition
  • Electrical installation certificate (Part P)
  • Gas Safe certificate (if gas work was carried out)
  • FENSA certificate (if windows were replaced)
  • Builder’s warranty or guarantee

Get planning updates by email

Related guides, tool tips, and planning news — no spam, unsubscribe any time.

Frequently asked questions

Get personalised recommendations for your property

Enter your address to see planning rules specific to your council, any conservation area restrictions, and what you can build without planning permission.

Free check — no account required