EXAMPLE REPORTThis is a sample to show what you will receive. Your report is specific to your property and project.Get your report →
Building Control Report

22 Maple Road, Leeds LS6 2AB

Work type: Loft conversion  •  LPA: Leeds City Council

Get your report for your property — complete in 2 minutes, delivered instantlyGet your report — £39 →

Approved Documents for This Project

PartTitleWhat to address
AStructureNew floor joists to carry habitable loads. Ridge beam if hip-to-gable. Temporary propping calculations required.
B1Fire SafetyProtected escape route from new storey. Fire doors on each landing. 30-minute fire resistance to floor/ceiling. Interlinked alarms.
FVentilationHabitable rooms need openable windows ≥ 1/20 floor area. Roof space ventilation above insulation.
KProtection from FallingStair pitch max 42°. Min 2m headroom at centre. Handrail both sides if >1m wide. Balustrade min 900mm.
L1BConservation of EnergyInsulation between and above rafters. U-value 0.16 W/m²K. Cold bridge at eaves critical.

Recommended Route

✓ Strongly recommended

Full Plans

Loft conversions involve structural changes and a new fire escape route — both require early inspector sign-off. Full Plans allows the inspector to review and approve your drawings before work begins, significantly reducing the risk of costly remedial work.

Inspection Stage Timeline

1

Commencement notice

2

Structural frame / floor joists

3

Fire protection (boarding, fire doors, alarms)

4

Insulation

5

Staircase (before boarding)

6

Final inspection

Local Authority Building Control Contact

Leeds City Council Building Control

Telephone

0113 222 4444

Email

buildingcontrol@leeds.gov.uk

Website

www.leeds.gov.uk/buildingcontrol

Private inspector alternatives: LABC / NHBC

Compliance Checklist

Structural engineer appointed and calculations agreed
Full Plans application submitted and approved
Commencement notice given (at least 2 days before work starts)
Floor joist inspection booked (before boarding)
Fire doors and alarm system installed per Part B1
Insulation installed per Part L1B specification
Staircase inspected and approved
Final inspection passed — completion certificate requested

Ready to get your report?

Your report is specific to your property and project. Delivered in minutes.

Get your report — £39 →

One-off payment. Delivered to your email within 2–3 minutes.