Building Control Completion Pack

8 Victoria Terrace, Manchester M20 3EG

Project: Side extension  •  BC route: Full Plans  •  Ref: BLD/2024/01847

Get your pack for your project — complete in 2 minutes, delivered instantlyGet your pack — £69 →

Inspection Status

Commencement notice
Signed off 14 Mar 2024
Foundations
Signed off 28 Mar 2024
DPC / oversite
Signed off 12 Apr 2024
Frame / structural elements
Signed off 3 May 2024
Insulation
Signed off 21 May 2024
Final inspection
Not yet booked

Document Tracker

DocumentStatusNotes
Structural calculations ReceivedFrom SE ref SC/24/0847
As-built drawings Not yet providedRequired before final inspection
SAP/EPC assessment Not yet providedRequired before completion cert issued
FENSA certificate (windows) ReceivedIssued by installer
Part P electrical certificate ReceivedFrom registered electrician
Structural warranty PendingRequest from builder

Outstanding Items

2 items to resolve before calling for final inspection

As-built drawings not yet provided

Your building control officer needs a set of as-built drawings reflecting any changes made during construction.

Action: Ask your architect or designer to prepare these before calling for the final inspection.

SAP/EPC not commissioned

A post-construction SAP calculation is required to issue the completion certificate for new build or extension work.

Action: Commission a SAP assessor — typical cost £150–£300. Allow 5–10 working days.

Pre-Final Inspection Checklist

All structural work complete and matching approved drawings
All drainage connected and tested
Insulation installed and matching specification
All fire doors installed, self-closing, and labelled
Smoke/heat alarms installed and interlinked
Electrical installation complete, tested, and certificated (Part P)
Windows FENSA-certificated or BC-approved
Ventilation (trickle vents, extract fans) installed and commissioned
As-built drawings provided to inspector
SAP/EPC assessment provided to inspector
All external works complete (DPC above external ground level)
Site cleared and safe for final inspection

What Happens After Sign-Off

Completion certificate issued by your building control officer. Keep this permanently — needed for sale, remortgage, and insurance claims.
Register the EPC on the national database (your SAP assessor normally does this).
Notify your structural warranty provider that the build is complete.